Spring Ridge Architectural Control Committee Policies

 
This page contains links to the current Spring Ridge ACC Exterior Alteration Policies. All of them require the following to be submitted by email only to the ACC Chair at least two weeks prior to any work beginning:
  1. Hold Harmless Agreement - signed by all parties
  2. Alteration/Modification Application  - contractor drawings /diagrams may be required, as well as pictures of any new projects or products being proposed. ACC will not research products.
Specific ACC Policies:
 
Routine Maintenance Guidelines                                                                           
 

Awning Installation Policy                                                                                              
 
 
 
Front and Rear Door Replacement/Repaint Policy                                                                                                                                                                     
 
Garage Light Repair or Replacement Policy                                                         
 
Gutter Protection System Policy                                               
 
 
Outdoor Drainage Policy                                                                                                  
 
 
 
                                                                          
Roofing Repair and Replacement Policy                                                                           
 
SolaTube (Tubular) Skylight Policy                                                                                                                                                                                                                                         
 
Windows Shutter Policy